LICENSE
posted @ 4:16 pm in [ SPASMS ]

Of the two sisters, Karen was the nice one. Marilyn was the one most likely to do something stupid. Which was exactly what she did, one too many times. When Marilyn was caught driving drunk, she already had a suspended license for exactly that reason.

Easy enough to solve, she thought. “Sorry, officer, I forgot my license. My name’s Karen Cauldwell, and I live at—” she was slurring, but sober enough to give her sister’s address.

The officer checked, and sure enough, a Karen Cauldwell matching the drunk’s description lived at that address. The face that came up on the computer screen was similar enough to that of the drunk, and the physical description—five foot six, brown hair, green eyes—fit. Marilyn was booked and fingerprinted under Karen’s name, and Karen’s license was suspended.

The first thing Marilyn did when she was released on bail the next day was go online to the Department of Motor vehicles site and change Karen’s address to her own. That way, the suspension notice would be mailed to Marilyn’s own home, Marilyn would pay the fine, switch Karen’s address back, and nobody would be the wiser. Karen wouldn’t get mad, and Marilyn wouldn’t get in trouble.

Except that the very day after her address was changed without her permission, Karen went to the DMV to renew her license, and found it was suspended. Angry, Karen paid the fine—she had to have a license, after all—and determined to confront her sister.

But a couple of bad checks Marilyn had written caught up with her, and she left town, pronto. Karen arrived at Marilyn’s apartment, only to find her sister gone.

Well. Time to play a little identity theft herself, Karen mused. Her husband had ruined her credit before their divorce. Marilyn had just been given a credit card by some credit company who wasn’t paying attention. Karen went through the unopened mail, found the card, and decided the American Express card with the $5,000 limit was payback for the fine.

But Karen was basically a decent person. She could never let a bill go without paying it. In no time at all, Marilyn’s credit rating had skyrocketed.

A year later and several states away, Marilyn developed a drug habit. Inevitably, she hit upon the idea of calling up for a credit card. She was astonished to be awarded a $14,000 card with no questions asked.

Karen was disappointed, but not surprised, to find the credit rating she’d worked so hard to establish dropping before her very eyes. It wasn’t difficult to track her sister down in Nevada. Karen didn’t bother contacting Marilyn to let her know she was in town; she simply waited in the dark alley behind the diner where Marilyn worked, with the engine running. When Marilyn came out from her shift, Karen floored it.

Afterwards, Karen took the new credit card and ID card from Marilyn’s wallet. She put her own driver’s license in its place and drove away.

A crackhead came upon Marilyn’s body a short time later. The woman wasn’t too strung out to take Karen’s driver’s license and the cash.

That license sure would come in handy.

 

Copyright 2008 Amy Frushour Kelly. All rights reserved.

Reproduction by any means prohibited without prior written consent.

 

 


Leave a Reply